Prologis Park, Coventry

  • Project: Prologis Park
  • Client: Deecon Civils
  • Value: £28,000
  • Date: July 2007

Stabilisation was required to condition unsuitable site won material and produce an engineered fill and a subbase replacement layer, 300mm thick.  Whilst on site, the client discoved an area of ground nearly 4 metres deep that was unsuitable to use in the construction of the warehouse facility.  Beach stabilised the material with 2% Quicklime and it was replaced in the hole, saving several thousand pounds on muckway and import costs.