Manchester

  • Project: Runway No.2 - Manchester Airport
  • Client: VHE Construction
  • Value: £503,000
  • Date: 1998 - 1999

Specification lime inprovement of bulk fill material to be used in the layers to fill the Bollin Valley, under 2nd runway.  On site testing carried out by Main Contractor.  The quantity of the lime per square metre was monitored by beach and adjusted to suit the changes in moisture in the natural material.

Volume of fill treated: 215,000m3