Formation of a piling platform for the development of the new school complex. The material contained sulphates, so was treated with a combination of Quicklime and GGBS (Gound Granulated Blastfurnace Slag). The strength requirement of 200Kn/m2 was achieved.
Modification of site won material to form a fill on the development of the Olympic Village for the 2012 Games.
Another 2 visits to modify material to form a fill on the development of the Olympic Village for the 2012 Games