Lime/OPC stabilisation to produce a piling platform, road infrastructure and associated works. Cut and fill contract. Road area was treated to 400mm with lime and 350mm with OPC.
Area of stabilisation: 110,000m2
Depth of stabilisation: 350 - 400mm
<< Back