Lime/Cement stabilisation of site won material to form fill and capping material..This 'Blue Chip' contract was carried out within bounds of the River Eden - and S.S.S.I. and European Site of Enviromental value. The project was successfully completed without incident.
A unique contract to soil stabilisation! The client has a rally car testing site that suffered from excessive rutting after only one test run. Beach was asked to design a pavement that would stand up to this very unusual wear - especially on the corners. A mix design was drawn up and areas were treated. On the 5th November, non other than double world champion, Marcus Gronholm tested a current RWC car on the areas and failed to damage the surface at all. Subsequent visit in May/June 2007 to complete phase 1 of the project. Further Works scheduled for August 2009.
Further Stabilisation of rally track.